LOLER Checklist — Slings, Chains and Lifting Accessories — lolerflow.co.uk
Complete on site, then save: Work through each item during the examination. Use the register below to record each individual accessory examined, then click "Save as PDF" above.
6-month examination interval: Lifting accessories are subject to LOLER 1998 Regulation 9(3)(b) — thorough examination at least every 6 months.
LOLER Inspection Checklist — Slings, Chains and Lifting Accessories
LOLER 1998 (SI 1998/2307) · Examination interval: 6 months · Working document only — not a substitute for the signed ROTE · Template by lolerflow.co.uk