Complete on site, then save: Work through each item during the examination. Mark results and add observations, then click "Save as PDF" above.
6-month examination interval: Patient hoists carry persons — LOLER 1998 Regulation 9(3)(a) requires a thorough examination at least every 6 months.
Free Patient Hoist LOLER Inspection Checklist
LOLER 1998 (SI 1998/2307) · Examination interval: 6 months (carries persons) · Working document only — not a substitute for the signed ROTE · Template by lolerflow.co.uk
Lolerflow
1 · Track, Carriage and Sling Bar (Ceiling / Gantry Hoists)
ItemObservationsResult
2 · Chassis and Frame (Mobile Hoists)
ItemObservationsResult
3 · Motor Unit and Controls
ItemObservationsResult