Complete on site, then save: Work through each item during the examination. Mark results and add observations, then click "Save as PDF" above.
6-month examination interval: Spreader beams and lifting frames are lifting accessories — LOLER 1998 Regulation 9(3)(b) requires thorough examination at least every 6 months.
Free Spreader Beam & Lifting Frame LOLER Inspection Checklist
LOLER 1998 (SI 1998/2307) · Examination interval: 6 months · Working document only — not a substitute for the signed ROTE · Template by lolerflow.co.uk
Lolerflow
1 · Structural Member
ItemObservationsResult
2 · Attachment Points and Hardware
ItemObservationsResult
3 · Marking and Documentation
ItemObservationsResult