LOLER Report of Thorough Examination — lolerflow.co.uk
Complete the form first, then save: Fill in all fields below using your keyboard. When finished, click "Save as PDF" above — your browser will open a print dialog. Choose "Save as PDF" as the destination to download your completed certificate.
Report of Thorough Examination
Lifting Operations and Lifting Equipment Regulations 1998 (SI 1998/2307) — Schedule 1 Compliant
Template provided by lolerflow.co.uk · Free to use and reproduce
1 · Employer and Site Details (Schedule 1: a, b)
2 · Equipment Identification (Schedule 1: c, e)
3 · Examination Findings
4 · Defects Found (Schedule 1: i, j) — tick one
Category AImmediate DangerEquipment MUST be withdrawn from service immediately. Copy of this report must reach the enforcing authority within 28 days (LOLER Reg. 10).
Category BNot Immediately DangerousEquipment may remain in service but defect must be rectified by the date specified below.
No DefectNo defects found.Equipment is safe to continue in service.
5 · Conclusion (Schedule 1: f, g, h)
6 · Competent Person Declaration (Schedule 1: k, l)