Home / Industries / Construction and utilities

For construction and utilities contractors

LOLER and PUWER software for construction and utilities contractors

Cranes, hoists, MEWPs and lifting accessories move from job to job. LolerFlow keeps every examination with the equipment, so you can prove compliance on any site.

Mobile crane lifting a steel frame on wire rope slings at a construction site
In short

On construction and utility sites, LOLER requires lifting equipment to be thoroughly examined before first use where its safety depends on how it is installed, then every 6 or 12 months. LolerFlow keeps the register, certificates and due dates for every item across every site, ready for a principal contractor or an HSE visit. The same cranes, hoists and MEWPs also come under PUWER for maintenance, pre-use checks and inspection, and LolerFlow records both.

Last updated October 2026 · Written by the LolerFlow Editorial Team · Facts checked against HSE and legislation.gov.uk

The rules

When does construction lifting equipment need a thorough examination?

LOLER Regulation 9 requires a thorough examination after installation and before first use where safety depends on how the equipment is installed, for example a tower crane or a construction hoist, and again after it is put up at a new site. After that, equipment that lifts people and all lifting accessories need examining every 6 months, and other lifting equipment every 12 months. Exceptional events, like damage or a long period out of use, also trigger an examination.

PUWER 1998 applies to every piece of work equipment on site, including the non-lifting parts of cranes, hoists, MEWPs and excavators. It needs suitable equipment, maintenance, pre-use checks, inspection at intervals you set by risk, and trained operators. MEWPs need both: a 6 monthly LOLER thorough examination and PUWER checks between them.

EquipmentThorough examination
Equipment for lifting people (MEWPs, man baskets, passenger hoists)6 months
Lifting accessories (chains, slings, shackles)6 months
Other lifting equipment (cranes, goods hoists)12 months
Equipment where safety depends on installationAfter each installation, before first use

These are the standard legal intervals. A written scheme of examination can set different ones, and LolerFlow follows whichever applies.

Also included

MEWPs and PUWER in the same register. Run your 6 monthly MEWP examinations with a dedicated template, and record PUWER inspections for plant and site equipment without a second system. MEWP inspections · PUWER inspections

Sources
  • LOLER 1998, Regulations 9 and 10, legislation.gov.uk
  • HSE L113 Safe use of lifting equipment, Approved Code of Practice
Three lifting inspectors in hard hats and hi-vis talking on site
The problem

What makes it hard

Equipment moves every week

It was on the last job. Nobody updated where it went.

The principal contractor wants proof

Certificates for every item, before work starts.

Kit from hire firms and subcontractors

Some is yours, some is not, and it all needs to be in date.

What changes for you

What changes on your sites

Pass the principal contractor's check first time

Certificates for every item on site before work starts, in one audit pack.

Records move with the kit

Move equipment to a new job and its record moves with it.

MEWPs, plant and lifting gear together

6 month MEWP examinations, PUWER plant inspections and LOLER lifting gear in one register.

Hired kit on record too

Add equipment from hire firms and subcontractors, so everything on site is visible.

LOLERPUWERMEWPEquipment register
How LolerFlow helps

How LolerFlow helps construction and utilities

Sites and locations

Every job is a site. Move equipment between them and the record moves too.

Due dates on one dashboard

See what is due across every site before it becomes a problem.

Audit packs in one click

Give the principal contractor a complete pack for the site.

Defects with a severity

Log a defect, take the item out of service and track the repair.

LolerFlow asset register for construction and utilities
Equipment by site, so the record follows the machine when it moves to the next job.
Equipment covered

What equipment can you track?

Tower and mobile cranes (LOLER and PUWER)Construction hoists (LOLER and PUWER)MEWPs (LOLER and PUWER)Excavators used for lifting (LOLER and PUWER)Chains, slings and shackles (LOLER)Lifting beams (LOLER)Manhole and cable drum lifters (LOLER)Pipe and kerb lifters (LOLER)
Questions

Frequently asked questions

Does a tower crane need a new LOLER examination at each site?

Yes. Where safety depends on installation, LOLER requires a thorough examination after the equipment is installed and before first use, including after it is put up at a new location.

How often do MEWPs and passenger hoists need examining?

At least every 6 months, because they lift people, unless a written scheme of examination sets a different interval.

Who keeps the LOLER records on a construction site?

The employer or person in control of the lifting equipment. On most sites the principal contractor will also ask to see certificates before equipment is used.

Can we track hired and subcontractor equipment as well as our own?

Yes. Record every item used on site, with who owns it, its certificate and its next due date.

What happens if lifting equipment is found with a dangerous defect?

The competent person must tell the employer straight away. If there is an existing or imminent risk of serious injury, they must also send a copy of the report to the enforcing authority, such as the HSE. The equipment must not be used until the defect is put right.

From the blog

Guides for this industry

See LolerFlow on your own equipment

A 20 minute walkthrough with the team who built it. Or start a free 30 day trial, no card needed.