Home / Industries / Plant and tool hire

For plant and tool hire companies

LOLER and PUWER software for plant and tool hire companies

Telehandlers, MEWPs, excavators and lifting accessories each have their own examination cycle. LolerFlow tracks every one across every depot, so nothing leaves the yard overdue.

Inspector with a clipboard checking a hire machine
In short

Hire companies must make sure every piece of lifting equipment leaves the yard with evidence of its last thorough examination, under LOLER Regulation 9(4). LolerFlow keeps the examination record, the certificate and the next due date for every machine and accessory in your fleet, across every depot. Every machine on hire is also work equipment under PUWER, so its maintenance and inspection records travel with the LOLER certificate.

Last updated October 2026 · Written by the LolerFlow Editorial Team · Facts checked against HSE and legislation.gov.uk

The rules

How often does hired lifting equipment need a LOLER examination?

It depends on what the machine does, not what it is. A telehandler lifting goods needs a thorough examination at least every 12 months. The same telehandler fitted with a man basket lifts people, so it drops to every 6 months. MEWPs lift people, so they are always 6 months. Chains, slings and shackles are lifting accessories, so they are 6 months too. LOLER Regulation 9(4) also says no lifting equipment may leave your business, or be used on someone else's site, without physical evidence that its last thorough examination was done.

EquipmentRuleThorough examination
Telehandler, lifting goods onlyLOLER and PUWER12 months
Telehandler with a man basketLOLER and PUWER6 months
MEWPs and access platformsLOLER and PUWER6 months
Excavator used for liftingLOLER and PUWER12 months
Lorry loader craneLOLER and PUWER12 months
Lifting accessories (chains, slings, shackles)LOLER6 months

These are the standard legal intervals. A written scheme of examination can set different ones, and LolerFlow follows whichever applies.

Also included

MEWPs and PUWER in the same register. Run your 6 monthly MEWP examinations with a dedicated template, and record PUWER inspections for the rest of the fleet, without a second system. MEWP inspections · PUWER inspections

Sources
  • LOLER 1998, Regulation 9(3) intervals and Regulation 9(4) evidence of examination, legislation.gov.uk
  • HSE: Lifting equipment used for lifting people at work, hse.gov.uk
Smiling forklift operator in a yellow hard hat
The problem

What makes it hard

Turned away at the gate

The site manager asks for the certificate and nobody can find it.

Due dates missed while on hire

A machine comes back from a long hire already past its examination.

Different rules for the same machine

A telehandler on a 12 month cycle drops to 6 months once it carries a man basket.

What changes for you

What changes for your hire business

Nothing leaves the yard overdue

Check every machine's LOLER and PUWER dates before it goes out on hire.

No more turned away at the gate

Send the current certificate for any machine in seconds, from your phone.

MEWPs on the right cycle

6 month examinations tracked machine by machine, including telehandlers once they carry a man basket.

One register for the whole fleet

Every depot and every machine, with its status, so a failed item is never hired out.

LOLERPUWERMEWPEquipment register
How LolerFlow helps

How LolerFlow helps plant and tool hire

Every depot in one register

Each depot is a site. See every machine, where it is and when it is due.

Due dates that track themselves

Next examination dates are worked out from the interval, and overdue items show in red.

Certificates on demand

Download or send the current certificate for any machine in seconds.

Out of service means out of service

Fail an item and it is marked out of service, so it does not get hired out by mistake.

A large organisation?

Our Enterprise plan adds a signed agreement, help moving your records across, and templates built to your company standard.

See Enterprise
LolerFlow asset register for plant and tool hire
One depot’s fleet, with the next examination date on every machine before it goes back out on hire.
Equipment covered

What equipment can you track?

Telehandlers (LOLER and PUWER)MEWPs and access platforms (LOLER and PUWER)Excavators used for lifting (LOLER and PUWER)Lorry loaders (LOLER and PUWER)Forklifts (LOLER and PUWER)Chains, slings and shackles (LOLER)Lifting beams (LOLER)Hoists (LOLER and PUWER)Other hire plant such as dumpers and compressors (PUWER)
Questions

Frequently asked questions

Who is responsible for LOLER on hired equipment?

The hire company must supply lifting equipment with evidence of its last thorough examination. The customer using it must make sure it is examined while it is in their care if the hire runs past the due date, and must carry out lifting operations safely. Agree in writing who arranges examinations on long hires.

How often does a telehandler need a LOLER inspection?

At least every 12 months when it lifts goods only, and at least every 6 months when it is used to lift people, for example with a man basket. A written scheme of examination can set different intervals.

Do MEWPs need a LOLER thorough examination every 6 months?

Yes. MEWPs lift people, so LOLER requires a thorough examination at least every 6 months, unless a written scheme of examination sets a different interval.

Does an excavator need a LOLER inspection?

Only if it is used for lifting, for example lifting pipes with a chain from the bucket. Then it is lifting equipment and needs a thorough examination at least every 12 months, and its lifting accessories every 6 months.

Can my customers get certificates without calling us?

Yes. Customers can log in to the client portal and download the current certificate for any machine on hire to them, or you can send it from LolerFlow in a few seconds.

From the blog

Guides for this industry

See LolerFlow on your own equipment

A 20 minute walkthrough with the team who built it. Or start a free 30 day trial, no card needed.