Home · Features

Schedule 1 Compliant Reports, Instant, Automatic

Every LOLER examination report auto-generated to HSE Schedule 1 standard. PDF and Excel. Available in the client portal the moment you submit.

MEWP examinations produce the same Schedule 1 report. PUWER inspections produce the record Regulation 6 requires, in the same PDF and Excel formats.

Start free trialBook a demo

All 11 Schedule 1 items, included automatically

Schedule 1 of LOLER 1998 sets out exactly what every thorough examination report must contain. LolerFlow captures all 11 items during the inspection and populates the report automatically, nothing missing, nothing left to add later.

✓Name and address of the employer for whom the thorough examination was made
✓Address of the premises at which the thorough examination was made
✓Particulars sufficient to identify the lifting equipment, including its date of manufacture where known
✓Date of the last thorough examination
✓Safe working load (or the safe working load for the configuration last examined)
✓For a first examination after installation or assembly at a new site: a statement that it is such an examination, that the equipment is installed correctly and is safe to operate
✓For every other examination: whether it is a 6 month, 12 month, examination scheme or exceptional circumstances examination, and whether the equipment is safe to operate
✓Any defect which is or could become a danger to persons, the repair, renewal or alteration required, the time by which it could become a danger, the latest date for the next thorough examination, particulars of any test, and the date of the thorough examination
✓Name, address and qualifications of the person making the report, and whether they are self-employed or the name and address of their employer
✓Name and address of the person signing or authenticating the report on behalf of its author
✓Date of the report

From inspection to certificate, zero admin

  1. 1
    Complete inspection on site
    Work through the guided form on your phone. Mandatory fields are enforced.
  2. 2
    Submit, report generated instantly
    The PDF is generated automatically. No typing, no formatting, no back-office delays.
  3. 3
    Available in client portal immediately
    Clients log in and download their certificate. No email threads, no chasing.
  4. 4
    Stored permanently against the asset
    Every report retained in the asset inspection history, retrievable in seconds for HSE audits.

Why Schedule 1 compliance matters

Under Regulation 10 of LOLER 1998, every thorough examination must produce a written report containing all 11 items specified in Schedule 1 of the regulations. Missing even one field means the report is technically non-compliant, and in an HSE inspection, incomplete records are one of the first things auditors flag.

Paper-based and spreadsheet workflows are particularly vulnerable here. Inspectors working with handwritten forms regularly miss fields under time pressure, especially defect categorisation and next examination dates. When those notes are typed up hours later, details get lost or transposed. The result is a report that looks complete but fails under scrutiny.

LolerFlow eliminates this risk entirely. The inspection form enforces every mandatory field before submission is allowed. You physically cannot generate a report with missing data. This is why purpose-built LOLER inspection software outperforms generic tools, it is designed around the specific legal requirements of Schedule 1, not retrofitted from a general-purpose template.

PDF and Excel, both formats, instantly

Different clients need different formats. Some want a formal PDF certificate for their compliance file. Others need an Excel export they can filter, sort, and import into their own equipment register or maintenance system. LolerFlow generates both automatically at the moment of submission, no manual formatting, no copy-paste into templates, no waiting for the back office.

For inspection companies managing 200+ assets across multiple clients, this saves hours every week. Instead of an inspector spending 45–60 minutes each evening typing up handwritten notes, the certificate is ready before they leave the site. That time saving alone, typically an hour a day per inspector, translates to a significant reduction in overhead compared to spreadsheet-based workflows.

Permanent storage and instant retrieval

Under LOLER record keeping requirements, the report of the first thorough examination (before first use) is kept for as long as the equipment is in use, lifting accessory reports are kept for 2 years, and every other report is kept until the next report, or for 2 years, whichever is later. Many duty holders keep records for the working life of the equipment. LolerFlow stores every report permanently against the asset record, with no automatic deletion. When an HSE inspector requests the examination history for a specific crane, forklift, or MEWP, you can retrieve it in under 10 seconds, not 10 minutes searching through filing cabinets.

Every report is searchable by asset, client, date, defect category, or inspector. Category A, B, and C defect classifications are tracked with resolution status and dates, giving you a complete audit trail that demonstrates ongoing compliance.

Your clients also benefit through the self-serve client portal, they can log in at any time to view and download certificates for their equipment without needing to contact you. No email threads, no chasing, no delays.

Built to the Schedule 1 standard

The 11 Schedule 1 items listed above are not guidelines, they are the minimum legal standard under Regulation 10. LolerFlow captures every one of them during the guided inspection form and populates them into the final report automatically. Mandatory fields are enforced, the form cannot be submitted until all required data has been entered. This means every report produced by LolerFlow meets the Schedule 1 standard by construction, not by chance.

Reports that protect your business

As a competent person carrying out thorough examinations, your examination reports are legal documents. If an accident occurs and a report is later found to be incomplete, inaccurate, or missing, the consequences can include significant HSE penalties, including unlimited fines under the Health and Safety at Work Act 1974 and, in serious cases, criminal prosecution.

Every submitted report is kept permanently against the asset, so there is a clear record of what was found, when, and by whom. This protects both the inspection company and the duty holder. For independent inspection companies, this level of documentation is not just good practice, it is essential professional protection.

HSE-ready reports. Zero extra effort.

30-day free trial. No credit card required.

Start free trialBook a demo
Back to features